IL Electrical Contractor License Cost
Illinois has no statewide electrical contractor license—cities set their own fees. Current examples: Chicago $150/year to register (with $100 for supervisor changes), Peoria $150/year, Libertyville $100 exam + $120 renewal. Expect occasional $50 administrative fees and local insurance/bond requirements.
Electrical contractor license cost in Illinois is set locally, not by the state. Expect around $150 per year in major cities: Chicago charges $150 for contractor registration; Peoria charges $150; Libertyville charges $100 to test plus $120 to renew. Some cities add $50 admin or change fees. Chicago fee, Peoria fee, Libertyville fees.
Requirements last verified: 2026-10-22
| Requirement | Details |
|---|---|
| Licensing agency | No statewide license. Licensing/registration is by municipality (e.g., City of Chicago Department of Buildings; City of Peoria Development Center; Village of Libertyville Community Development). See Chicago’s electrical contractor chapter 4-290 and Peoria’s Trade Licenses. |
| Fees | Chicago: $150 per year to register as an electrical contractor; $100 fee when changing supervising electrician; some $50 administrative processing fees apply to license modifications (4-290-050, 4-5-010). Peoria: $150 annual license (city page, application). Libertyville: $100 exam + $120 annual renewal (village page). |
| Experience | Chicago requires a licensed Supervising Electrician with at least 2 years of relevant experience to be appointed/employed by each registered contractor (4-292-020, 4-290-035). |
| Exam | Chicago: Supervising Electrician must pass the city exam; the contractor license/registration itself has no separate exam (4-292-040). Many municipalities accept ICC electrical certifications in lieu of local testing (e.g., Naperville guidance here). |
| Minimum age | 21 for Chicago Supervising Electrician (4-292-020). |
| Insurance/Bond | Varies by city. Chicago’s licensing framework provides for required insurance/bond information and assesses a $50 administrative fee for certain license changes; contractors should be prepared to provide proof of coverage (4-5-010). Chicago’s public license database also tracks insurance/bond expirations for trade licenses (city database). |
| Renewal | Chicago: annual renewal at $150 (4-290-050). Peoria: annual; licenses expire Dec 31 (city page). Libertyville: annual $120 renewal (village page). |
How to estimate your Illinois electrical contractor license cost
- Confirm your job location and authority. Illinois has no statewide license; contact the local building department where you’ll work (e.g., Chicago, Peoria, Libertyville).
- Verify if a Supervising Electrician is required. In Chicago you must appoint one who meets age/experience and passes the exam (4-292-020, 4-292-040).
- Calculate license/registration fees. Use the posted schedules: Chicago $150; Peoria $150; Libertyville $100 exam + $120 renewal (Chicago fee, Peoria, Libertyville).
- Budget for admin changes and insurance/bond. Chicago assesses $50 for certain license modifications and $100 to change supervising electrician; many cities require proof of insurance/bond (4-5-010, 4-290-050).
- Set up the permit account. In Chicago, electrical-only permits require your online account be linked to an active electrical contractor license (electrical-only permit instructions).
- Renew on time. Chicago and Peoria renew annually; Libertyville renews annually each December (Peoria, Libertyville).
Electrical contractor license cost in Illinois: what varies by city
Because Illinois has no statewide electrical contractor license, each municipality sets its own pricing and process. Chicago requires a registered contractor and a licensed Supervising Electrician; the contractor registration is $150 per year and change fees may apply (4-290-050, 4-5-010).
Other Illinois cities commonly align in the same range. Peoria licenses electrical contractors at $150 per year (official page). Libertyville runs a local exam ($100) and renews annually at $120 (official page).
Do I need a state license, or only local registration?
As of October 22, 2026, Illinois has not enacted a statewide electrical licensing law. A 2025 bill (SB2307) proposed statewide licensing but is not law; plan on municipal licensing/registration for each jurisdiction where you pull permits (ILGA bill text). Chicago’s active license database confirms licenses are administered locally (database).
Cost add‑ons many contractors overlook
- Supervising Electrician exam prep/time. Required in Chicago; minimum age 21 and 2 years’ experience (4-292-020).
- Administrative and change fees. Chicago charges $50 for certain license changes and $100 when changing the Supervising Electrician (4-5-010, 4-290-050).
- Insurance/bond documentation. Municipal programs frequently require proof of coverage; Chicago’s public portal tracks insurance/bond expirations for trade licenses (portal).
Working statewide? Budget for multiple local licenses
If your firm pulls permits in different jurisdictions, you may need to hold multiple local licenses or registrations and maintain varied renewal cycles. Our broader guide to Illinois trades contractor licensing explains how general and trade licenses fit together, and our Illinois HVAC contractor license guide shows another common trade’s city-by-city costs and steps.
Frequently Asked Questions
Is there a statewide electrical contractor license in Illinois?
No. Licensing is handled by municipalities. For example, Chicago requires annual contractor registration and a licensed Supervising Electrician, while other cities like Peoria and Libertyville run their own programs (Chicago 4-290; Peoria; Libertyville).
How much does an electrical contractor license cost in Chicago?
$150 per year to register as an electrical contractor; $100 to change the designated Supervising Electrician; $50 administrative fees apply to some license modifications (4-290-050, 4-5-010).
What are typical fees outside Chicago?
Peoria licenses electrical contractors at $150 per year. Libertyville charges $100 for the local exam and $120 for annual renewal. Always verify with the local building department before bidding (Peoria; Libertyville).
Do I need to pass an exam to be licensed?
Often yes—either you or your designated qualifier must. In Chicago, your Supervising Electrician must pass the city exam; the contractor registration itself has no separate exam requirement (4-292-040).
Can ICC electrical certifications substitute for local exams?
Many municipalities accept ICC certifications instead of a local test. Naperville, for instance, recognizes specific ICC electrical certifications for licensing/registration purposes (Naperville guidance).
How do I pull electrical permits in Chicago?
Your online account must be linked to an active electrical contractor or expediter license. Many straightforward electrical-only permits can be issued and paid online within minutes (permit instructions).
Want a fast, accurate cost plan for every Illinois city you work in? License Navigator can map your electrical contractor licensing costs, qualifiers, and renewal dates across municipalities—so you bid confidently and stay compliant.
Want it filed for you? Talk to a licensing expert
Published by
About this publication
Licensing Navigator researches business licensing requirements and organizes them into practical, state-by-state guidance. Our pages are research aids, not legal advice.