Electrical contractor license cost GA
The core state costs are a $40 application (Class I or II), a PSI exam registration fee paid to PSI when scheduling, and a $75 renewal due June 30 of even years. Late and lapsed surcharges are fixed by the Board. No insurance or bond is required by the Board to issue the license.
Expect the electrical contractor license cost in Georgia to include a $40 state application (Class I or II), a separate PSI exam registration fee paid to PSI at scheduling, and a $75 renewal every two years; late and reinstatement surcharges apply if you miss the June 30 even‑year deadline.
Requirements last verified: 2026-10-22
| Requirement | Details |
|---|---|
| Licensing agency | Georgia State Construction Industry Licensing Board – Division of Electrical Contractors (official how‑to guide). ([sos.ga.gov](https://sos.ga.gov/how-to-guide/how-guide-electrical-contractors)) |
| Application fee (by exam) | $40 total ($30 application + $10 processing) for Class I (Restricted) or Class II (Unrestricted) per the current application and fee schedule (application, fee schedule). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf)) |
| Exam & vendor | Board approval required; exam is delivered by PSI. PSI displays and collects a separate exam registration fee during scheduling on its portal (Electrical CIB). ([test-takers.psiexams.com](https://test-takers.psiexams.com/api/content/bulletin/4783)) |
| Experience | Minimum 4 years qualifying experience under a licensed electrical contractor; Class II must include experience beyond single‑phase, 400A systems (application instructions). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf)) |
| Minimum age | 21 years old (Board Rule 121‑3). (Rules, Chapter 121‑3). ([rules.sos.ga.gov](https://rules.sos.ga.gov/gac/121-3?utm_source=openai)) |
| Renewal | $75 biennial renewal; electrical licenses expire June 30 of even‑numbered years; late renewal (July 1–31) adds $100; lapsed ≤3 years $150; 3+ years requires re‑exam (fee schedule; renewal dates rule). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Electrical%20-%20Fee%20Schedule.pdf)) |
| Continuing education | 8 hours per 2‑year cycle (4 hours/year) for renewals (Electrical Contractor CE; Rule 121‑4). ([sos.ga.gov](https://sos.ga.gov/page/electrical-contractor-continuing-education?utm_source=openai)) |
| Insurance/bond | No liability insurance or bond is listed as a licensure prerequisite in the Board’s application checklists or rules (see application packet and rules). Local or client requirements may apply. ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf)) |
| Processing time | Applications are generally processed within about 20 business days after receipt (varies by volume) (how‑to guide). ([sos.ga.gov](https://sos.ga.gov/how-to-guide/how-guide-electrical-contractors)) |
How to calculate your Georgia electrical contractor license cost
- Confirm eligibility and experience. You’ll need 4 years qualifying experience (Class II must include work over single‑phase, 400A) and to be 21+ (application; rules). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf))
- Apply to the Board and pay $40. Submit the online/paper application with the $30 application fee + $10 processing fee, identity affidavit, background check, and three references (application). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf))
- Schedule your PSI exam and pay PSI’s exam fee. After approval, register with PSI; the exam fee is paid directly to PSI and shown at checkout in the PSI portal (Electrical CIB). ([test-takers.psiexams.com](https://test-takers.psiexams.com/api/content/bulletin/4783))
- Pass both parts of the exam. The exam is two parts in one sitting, with up to 8 hours total time, per PSI’s candidate handbook (Electrical CIB). ([test-takers.psiexams.com](https://test-takers.psiexams.com/api/content/bulletin/4783))
- Maintain your license. Budget $75 for renewal every two years by June 30 of even‑numbered years; late renewal adds $100; lapsed ≤3 years costs $150; 3+ years requires re‑exam (fee schedule). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Electrical%20-%20Fee%20Schedule.pdf))
Electrical contractor license cost in Georgia: itemized
For most first‑time applicants, mandatory state fees are straightforward: $40 to apply and PSI’s separate exam registration fee at scheduling. After you’re licensed, renewals are $75 every two years, with specific late/lapse surcharges fixed by the Board’s fee schedule. (Fee schedule; PSI handbook). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Electrical%20-%20Fee%20Schedule.pdf))
If you’re also exploring mechanical trades, compare these numbers to our breakdown of the HVAC contractor license cost in Georgia and see the full steps in our Georgia HVAC Contractor License guide for cross‑trade planning.
Georgia electrical contractor license: Class I vs. Class II costs
Application fees are identical for Class I (Restricted) and Class II (Unrestricted): $40 each. The experience you document differs—Class II must include over single‑phase, 400A systems—which can impact study materials and prep costs, but state fees remain the same (application). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf))
Renewal timing, CE and late fees for Georgia electrical contractors
Electrical licenses expire on June 30 of even‑numbered years; renew on time for $75, or $100 extra during the July 1–31 late window. If you lapse ≤3 years, reinstatement is $150; at 3+ years, you must re‑examine. Complete 8 CE hours per cycle (4 per year). (Fee schedule; CE page). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Electrical%20-%20Fee%20Schedule.pdf))
What costs are not required by the Georgia Board?
The Board does not list liability insurance or a surety bond as prerequisites to obtain an individual electrical contractor license; they aren’t on the application checklists or in Rule 121‑3. Your clients or local jurisdictions may still require coverage (application; rules). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf))
Researching adjacent licensure tracks for your firm? You can also review background, fees, and steps for the Georgia private investigator license and our condensed Georgia Private Investigator License guide to compare credentialing timelines.
Frequently Asked Questions
How much does it cost to get an electrical contractor license in Georgia?
Plan for a $40 Board application plus a separate PSI exam registration fee shown when you schedule with PSI; after passing, renewals are $75 every two years, with set late/lapse surcharges if you miss the June 30 even‑year deadline. (Fee schedule; PSI handbook). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Electrical%20-%20Fee%20Schedule.pdf))
When are Georgia electrical contractor renewals due and what are the penalties?
Renew by June 30 of even‑numbered years for $75. A late renewal window runs July 1–31 and adds $100; lapsed ≤3 years is $150; 3+ years requires re‑exam. (Board fee schedule). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Electrical%20-%20Fee%20Schedule.pdf))
What experience is required for Class I vs. Class II?
Both require at least 4 years qualifying experience. Class I covers systems up to single‑phase, 400A; Class II requires experience that includes installations beyond single‑phase, 400A under a Class II contractor. (application instructions). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf))
Is insurance or a bond required to obtain the license?
No. Neither is listed as a prerequisite by the Board in its application materials or rules for issuance. Local governments or customers may still require proof of coverage. (application; rules). ([sos.ga.gov](https://sos.ga.gov/sites/default/files/forms/44%20Application%20-%20Electrical%20EXAM.pdf))
How long does the Georgia electrical contractor application take to process?
The Secretary of State’s guidance indicates most complete applications are processed in about 20 business days, though timing varies with volume. (how‑to guide). ([sos.ga.gov](https://sos.ga.gov/how-to-guide/how-guide-electrical-contractors))
Need a fast, exact plan to budget, apply, and pass? License Navigator can build your Georgia electrical contractor licensing checklist with fees, forms, deadlines, and exam prep links tailored to your business.
Want it filed for you? Talk to a licensing expert
Published by
About this publication
Licensing Navigator researches business licensing requirements and organizes them into practical, state-by-state guidance. Our pages are research aids, not legal advice.